After 5 years of traveling full-time in a tiny home, this family of 6 realized they couldn’t go back to a “normal” life—so they bought 11 acres of raw desert in Cochise County, Arizona and started building their own off-grid village from the ground up… using the dirt beneath their feet.

Jonathan and Ashley Longnecker ‪@TinyShinyHome‬ and their 4 kids are creating a natural building homestead using earthbags, hyperadobe, and superadobe techniques—one structure at a time. What’s emerging is less a single house and more a small, self-built village.

So far, they’ve built a hyperadobe bedroom, bathroom, and chicken coop, a superadobe sleeping space, and an outdoor earthbag shower. They’ve added a goat milking and kidding barn made from shipping containers, a container guest room, and a renovated 1972 Airstream Sovereign that serves as both their original tiny home and a bunkhouse for the kids.

Around these structures, they’re developing the systems that make off-grid life work: solar power, water systems, a solar pump house, and permaculture-inspired design adapted to the desert.

Now they’re working on their most ambitious project yet: what may become the world’s largest hyperadobe home—a 5,000-square-foot round house built from earth-filled bags. Along the way, they’ve refined their own approach to hyperadobe, developing a faster, more efficient building method that Jonathan describes as “almost like 3D printing” with earth.

They homeschool their kids, build nearly everything themselves, and share the process as they go—testing ideas, refining techniques, and showing what it really takes to create an off-grid life from scratch, centered on family, creativity, and self-sufficiency.

​—Their channel ‪@TinyShinyHome‬
—Their free earthbag safety class: https://tinyshinyhome.com/hyperadobe-...
—Their latest build with lavacrete • The COOLEST Alternative Building Method Yo...

On *faircompanies: https://faircompanies.com/videos/5-ye...


create a detailed outline of this video. make a table of the buildings created on the property, their construction methods, materials used, sizes, time to build, and uses. describe the strategy the family used in constructing the buildings. describe the hyper adobe materials and building methods.

They’ve built a small earthbag “village” plus systems and are now focused on a very large hyperadobe roundhouse; most walls are made from on‑site soil in mesh tubes with minimal purchased materials.

Detailed outline of the video


Buildings on the property

Note: Sizes and build times are only given when mentioned in the video; otherwise they’re left approximate or qualitative.

Structures and key properties

Building / System Construction method Main materials Approx. size / geometry Time to build (mentioned) Primary uses
Solar Shed + Circular Bedroom (“Earthbag Solar Shed office / guest bedroom”) Hyperadobe / earthbag load‑bearing walls, framed roof On‑site soil mix in mesh tubes, 5% cement, plywood ceiling, earthen floor, glass bottle bricks, conventional roofing Shed + 10 ft diameter circular bedroom pod (16‑in thick walls) Not explicitly stated; first multi‑month project Solar power room, office, guest bedroom / primary bedroom pod for parents, demonstration of hyperadobe build
Outdoor earthbag shower Curved earthbag wall forming wraparound spiral Earthbags (likely hyperadobe style), concrete pad, glass bottle bricks, propane on‑demand water heater, plumbing to berm‑and‑swale One wrapping wall, human‑scale outdoor stall Not specified; later early project Outdoor shower, graywater to trees, landmark “magical” shower spot
Bathroom / Laundry building (“Casa de Caca”) Light‑framed building on conventional footing with plumbing; reused structure components Recycled deck (former Airstream deck), reused door and windows, conventional framing, plumbing and septic connection, rainwater catchment and solar Small bathhouse sized for toilet, sink, washer/dryer Built early; later retrofitted from composting to full plumbing (no durations given) Bathroom, flush toilet, laundry, water collection
1972 Airstream Sovereign (renovated) Aluminum travel trailer fully gutted and rebuilt interior Original Airstream shell, custom interior framing, fold‑down bunks and benches, table‑to‑bed conversion 31 ft overall, ~28 ft interior length Gut and rebuild done before property; time not stated Kids’ bunkhouse, extra sleeping space, vestige of traveling years
Superadobe dome (oldest daughter’s room) Superadobe earthbag dome with barbed wire between courses White woven earthbags, barbed wire, on‑site soil with stabilizer, bottle bricks, stained glass, small hyperadobe mini‑dome for woodstove 9 ft diameter dome; vertical clearance comfortable for a 6‑ft adult; stepped floor/bed platform Structural shell built in one week during workshop Sleeping room for oldest daughter, small fireplace nook, artistic showcase of dome building
Hyperadobe roundhouse (main family home) Hyperadobe earthbag circular structure with curved load‑bearing walls, straight framed interior walls, radial steel‑joist roof Hyperadobe mesh tubes with soil + 5% cement, rubble‑trench footings (300 tons AB mix), vapor barrier on lower courses, I‑beams over openings, steel straps and bond beam for roof anchoring, metal roof ~2,500 sq ft walkable interior, ~5,000 sq ft circular footprint; 12 ft tall at center, 9 ft at perimeter; 16‑in thick walls; 30+ courses of bags About 1.5 years for family to reach window top; another month with volunteers to finish walls (27 days for final 100 tons) Future primary residence (kitchen with 11‑ft window, kids’ bedrooms, mudroom, baths, courtyard, etc.), experimental large‑scale hyperadobe prototype
Hyperadobe bench and fire pit Low circular/arc seating in earthbags 18‑in bags for seat, 12‑in bags for backrest, 8‑in bags for fire pit ring, soil mix Bench sized for ~14 people; circular fire pit in center Not specified; smaller project Social gathering spot, fire circle, test bed for smaller circular earthbag forms
Chicken Garden (coop + garden) Circular hyperadobe/earthbag walls forming inner coop and outer garden ring Earthbags, framing and roofing for coop, rain‑catch roof, trees integrated into footprint, Victron‑powered pump, piping for drip irrigation Concentric rings: inner chicken coop, outer garden beds; shaded arcs from wall height; exact dimensions not mentioned Built mid‑sequence; duration not specified Central chicken coop, surrounding garden beds, integrated composting and cleanup system, water‑harvest and irrigation hub
Goat milking and kidding barn (shipping container barn) Modified shipping containers with framed interior, new roof and shade, fencing 40‑ft shipping container(s), insulation, framing, solar panels, rainwater catchment roof, fencing (field fencing style), welded openings/doors, stall partitions One main 40‑ft insulated container; adjoining container and fenced yards; modular stalls sized for goats Built after early earthbag projects; no explicit build time Climate‑controlled milking room with fridge, modular kidding stalls, feed storage, livestock management
Solar and water systems (distributed) Ground and roof‑mounted solar arrays, RV pumps, Victron pump systems, buried piping and trenching PV panels (~10 kW for main system), 30 kWh battery bank, charge controllers, inverters, RV pumps, marine batteries, rainwater tanks, berms and swales Systems span sheds, Airstream, chicken garden, barn, and future house roofs Pieces added over years; early simple systems, later upgraded Electrical power, water pressurization, irrigation, hot water for shower and buildings

Where details like exact wall lengths or build times are missing, the video simply doesn’t specify them.


Strategy behind how they built the “village”

Their overall strategy is staged experimentation: start small, learn on low‑risk structures, then scale up to a complex, permanent home.

Key elements of their approach:


Hyperadobe materials and building methods (as shown here)

Hyperadobe is a variation of earthbag construction using open‑mesh tubes instead of solid woven bags; this changes both material behavior and workflow.

Materials

Basic hyperadobe method as they use it

  1. Foundation and prep

    • Excavate rubble‑trench footings in the desired plan (circles, arcs, straight runs), fill with compacted aggregate, and wrap the lower earthbag courses in vapor barrier where needed.

    • Mark the geometry—often from a central point—so walls follow precise radii and alignments.

  2. Mixing and loading

    • Mix soil, sand, rock, and cement to desired ratio and moisture content in batches.

    • Use two modified 5‑gallon buckets with the bottoms removed as a tall collar; pull the hyperadobe tube over the bucket collar to hold it open.

    • Shovel or scoop the mix into the bucket; as the bag fills, it extrudes along the path of the wall, guided by a person or dolly—this is their “3D printing” analogy.

  3. Placing, tamping, and bonding layers

    • Lay filled tube along the wall line, shaping curves or straights as needed.

    • Once a course is laid, tamp thoroughly; the mesh allows the mix to lock through the holes, creating a rough, keyed surface.

    • Place the next course directly on top; when tamped, moist stabilized soil from both layers interlocks through the mesh, eliminating the need for barbed wire between courses.

  4. Openings, corners, and buttresses

    • Over windows and doors, place stout lintels or I‑beams extending at least a foot (they often go two feet) past each side of the opening.

    • At corners, stagger overlaps so perpendicular walls interlock, improving strength against lateral loads.

    • On long straight walls, build buttresses at least every ~10 ft, tying them into the main wall via overlapped courses.

  5. Vertical build and arches

    • For vertical walls with conventional roofs, they simply stack courses straight up to the designed height.

    • For arches (like hallway openings) the hyperadobe tube is started lower and carried up and over in a continuous run so its own compression closes the arch, similar to circular dome logic but applied to smaller spans.

  6. Bond beam and roof anchoring

    • At the top, they will place a continuous bond beam (often concrete or heavy timber/steel) sitting on the final courses.

    • Straps embedded between lower bag courses wrap over the bond beam so the massive walls clamp the roof down, an important detail in their high‑wind desert environment.

Differences vs. Superadobe (as described)

Taken together, the video shows hyperadobe as a low‑cost, labor‑intensive but highly adaptable method where a family (and occasional volunteers) can turn on‑site dirt into thick, durable walls and varied forms—from circular bedrooms and benches to a massive, multigenerational roundhouse.


Create a list of materials to build with hyperabobe. What are the steps in construction?

Hyperadobe Building

Here’s a concise, video‑based hyperadobe “bill of materials” plus the construction steps they actually describe using on site.

Materials for building with hyperadobe

Core structural materials

Forming, handling, and mixing gear

Structural and architectural components

Finishes and detailing

Optional / system materials (not strictly wall‑related, but used with hyperadobe builds)


Step‑by‑step hyperadobe construction process (their method)

This follows the sequence they describe when asked “What’s the process?” and as shown on the big roundhouse.

1. Site prep and foundations

  1. Choose building location and mark geometry (often from a central point for circles/roundhouses).

  2. Bring in aggregate (they used about 300 tons of AB mix for the main house) to raise grade where needed.

  3. Dig rubble trenches along the wall layout, about 18 inches deep in their case.

  4. Fill trenches with compressed rubble/stone (around 5 inches compacted) to form a rubble‑trench foundation.

  5. Wrap the lowest several hyperadobe courses (they used four) with vapor barrier to keep ground moisture out of the walls.

2. Mix the hyperadobe fill

  1. Mix soil in roughly equal parts clay, sand, and rock/aggregate.

  2. Add about 5% Portland cement to the dry mix for stabilization.

  3. Add water until the mix is damp enough to compact and “glue” but not soupy.

3. Load the tubes (their “3D printing” setup)

  1. Stack two 5‑gallon buckets with the bottoms removed to make a tall, open cylinder.

  2. Scrunch the hyperadobe tube over this collar so it stays open while filling.

  3. Shovel or scoop mixed soil into the bucket; as it fills, the tube extrudes along the wall line.

  4. Either hold the collar by hand or hang it on a dolly; one person pulls the dolly while others keep filling.

4. Lay and tamp each course

  1. Guide the filling tube along the marked wall path (curves, circles, straights, or over arches).

  2. Once a course is filled, stop and tamp thoroughly so the soil compacts and bulges slightly through the mesh.

  3. This bulging through the netting and the clay‑cement “glue” create mechanical keying between courses.

5. Stack courses and form openings

  1. Lay the next hyperadobe course directly on the tamped one, keeping wall thickness and alignment consistent.

  2. Over doors and windows, set heavy lintels or I‑beams, extending well past the opening (they used about 2 ft per side on an 11‑ft span) before continuing higher with more hyperadobe.

  3. At corners, overlap courses so intersecting walls lock together.

  4. On long straight walls, build buttresses at least every ~10 ft and interlock them with the main wall to resist lateral forces.

  5. For arches with hyperadobe, start the tube low, run it up and over in one continuous piece, then build adjacent courses up to it so the arch is self‑supporting under compression.

6. Build up to full height

  1. Repeat mixing, loading, laying, and tamping—course after course—until you reach the design height (their house is about 12 ft at center, 9 ft at perimeter, with ~30 courses).

  2. Respect wall weight: a small section of 16‑inch‑thick wall weighs hundreds of pounds, so geometry and buttressing must follow known earthbag rules.

7. Bond beam and roof anchoring

  1. As you approach the top, embed straps between courses that will later wrap over the bond beam.

  2. Install a continuous bond beam on top of the wall (concrete/steel/timber).

  3. Wrap embedded straps over the bond beam so the mass of the walls holds the roof down (critical in their high‑wind monsoon climate).

  4. Install roof structure (for them: metal bar joists in a radial pattern, purlins, and metal roofing with generous overhangs).

8. Plastering, floors, and finishes

  1. Apply earthen plaster inside and out, sometimes in two‑tone or decorative patterns.

  2. Set bottle bricks or glass elements where desired for light and color.

  3. Pour and finish earthen floors, then seal with multiple coats of boiled linseed oil; similarly, seal plywood ceilings with oil for a warm finish.

  4. Add systems (electrical, plumbing, minisplits) and interior framing as needed; many electrical boxes can be built into walls during bag stacking.

This is their field‑tested workflow; they specifically emphasize that hyperadobe is cheap in materials and safe to build, but either requires a big crew for speed or a willingness to go slowly as a small team.

Are you thinking about a small experimental hyperadobe structure (like a bench or tiny shed), or are you aiming straight at a full building?


What skills are needed to build or modify all of the types of buildings?

Each building type on their property pulls from a different but overlapping skill set: from basic dirt‑work and hand tools up through welding, solar design, and plumbing.

Big picture skill categories


Natural building and earthbag / hyperadobe

Needed for: Solar Shed + bedroom, outdoor shower, hyperadobe roundhouse, superadobe dome, bench, chicken garden walls.

This is the core skill set that lets them turn free dirt into structural walls, from tiny benches up to the 5,000‑square‑foot roundhouse footprint.


Carpentry and conventional building

Needed for: Bathhouse (“Casa de Caca”), roof structures, Airstream interior, interior walls in the roundhouse, coop roof and decks.

These skills bridge natural walls with more conventional, inspectable systems (doors, cabinets, framed partitions).


Metalwork, welding, and containers

Needed for: Shipping‑container goat barn, roof structure (used bar joists), large lintels and I‑beams over openings.

Without these, the climate‑controlled milking room and big window spans in earthbag walls would be very difficult to pull off.


Electrical, solar, and controls

Needed for: Solar Shed and main power system, pump systems, minisplits, container barn, house and bathhouse wiring.

These skills turn static buildings into a genuinely off‑grid homestead that doesn’t constantly break on them.


Plumbing, water, and drainage

Needed for: Bathhouse, outdoor shower, chicken garden irrigation, rainwater catchment on multiple roofs, container barn water, future house plumbing.

Plumbing is a major part of making the bathhouse and outdoor shower genuinely usable year‑round.


Design, layout, and structural literacy

Needed across all builds, but especially for the roundhouse, dome, and chicken garden.

This is less “swing a hammer” and more knowing what to swing it at—and what not to try without redesign.


Animal systems, homestead operations, and soft skills

Needed for: Chicken garden, goat barn, integrating animals with gardens, and running the whole compound.


If you were to focus your own learning, which skill domain do you most want to develop first: earthbag/hyperadobe wall building, or systems work (solar + plumbing) to support a future structure?